VolkerLaser was contracted by Kier Highways Ltd to deliver improvement works on the A3 Stoke Interchange in Guildford, Surrey, following months of early contract involvement (ECI) work with Kier and National Highways.

A3 Stoke Interchange works

Widening works to the A3 interchange

What we did

The primary works included widening the existing slip road and undertaking a number of upgrades to bring the road, in line with current national design standards. Works began by the team upgrading the existing drainage system from a gulley system to a combined kerb and drainage system, with necessary upgrades to the existing vehicle restraint system.

The project was also a collaborative effort, with our team utilising three other VolkerWessels UK business units for support on various aspects of the works. Piling works were completed by VolkerGroundEngineering, with the installation of a 145m retaining wall and 145m capping beam to support the verge works and related ground works. VolkerHighways was contracted to undertake various surfacing works, as well as providing upgrades to street lighting and signage. VolkerBrooks was also involved by contributing welding services to the project.

A3 Stoke interchange works 2

Works on the A3 Stoke Interchange

Further works were completed by our specialist team, as works progressed by completing full depth pavement construction up to 1,000m² and 4,000m² of surface course and high friction surfacing. The works were finished by updating the road markings to comply with the new road system.

We completed the works in line with the programmed and with the project being so successful, we were contracted to deliver another set of highways works just down the road at the University slip road for the same client.